Essential Website Maintenance – Thursday 9th January 2020

We will be carrying out essential website maintenance in the afternoon which will affect some functionality. We apologise in advance for any inconvenience the work may cause and will do all we can to keep disruption to an absolute minimum.

Stage 5 - Preferred Strategy


Summary (optional)
We outline our vision in the Preferred Strategy.
start content

We have produced a summary video which explains the process of producing the Replacement Local Development Plan


Video Transcript (PDF, 40Kb)

 

Preferred Strategy Summary (PDF)

We have produced a Preferred Strategy document for the Conwy RLDP. We have set out our vision, the issues and objectives. We have also set out the preferred levels of housing and jobs growth and where they should be located.

We looked at all the evidence when we wrote the Preferred Strategy.

Preferred Strategy (PDF)

We consulted on the Preferred Strategy between 29th July 2019 and 20th September 2019.

We will now look at all of the comments made to the Preferred Strategy and take them into account when we write the Deposit Plan.

You can view all the comments received on the Preferred Strategy on our consultation system or in the representation report.

Consultation System

Representation Report (PDF)

Consultation System Instructions (PDF)

In this section

Drag side panels here (optional)
end content
page rating

page rating - did you find what you were looking for?