Our plans for Kinmel Bay west and Towyn Revetment.
Map
Kinmel Bay West map
Legend
key1
Fully accessible beach access
key2
Stepped beach access
key19
Ramped beach access
key3
Rock armour barricade
key4
Raised sea wall defences
key6
Kinmel Bay Sands hub (at the end of St Asaph Avenue)
Legend - Facilities Proposed
key8
Cycle maintenance point
key12
Electric vehicle charging point
Coastal defences
Towyn Revetment (by Golden Sands holiday park)
Cross section of rock armour:
Towyn Revement Coastal Defence Proposals
- Increase the existing rock armour
- Raise the existing seawall, up to approximately 0.75m (2.5 feet) above the existing seawall
- Adapting the existing rock armour, and reusing and repurposing material where possible, will minimise the economic and environmental costs of the new defence.
Kinmel Bay west
Cross section of seawall:
Kinmel Bay West Defence 2024 En
- Raise the existing seawall by 0.5m (1.6 feet) along the front at Kinmel Bay West
Public space
- Towyn Revetment parklet with space to rest and play. This will provide a lovely spot to rest or have a picnic overlooking Kinmel Beach with:
- two new lounger seats
- a pair of picnic tables
- cycle parking
- litter bins
Artistic view of Towyn Revetment parklet
Artistic-birds-eye-view-of-Towyn-parklet700x393
Artistic view of coastal defences at Kinmel Bay west
Kinmel Bay West defences
wg-ccbc
Next page: Kinmel Bay east plans