Joint housing land availability studies (JHLAS)


Summary (optional)
Local planning Authorities have to ensure that sufficient land is available, or will become available for a five year supply for housing.
start content

Annual surveys take place of all sites with planning permission for residential development in Conwy County Borough (excluding Snowdonia National Park). This information is then used to calculate whether the land available can meet the anticipated need for housing land over the next five years. The final report is agreed by members of the study group and published, based on national guidance produced by the Welsh Government.

Joint Housing Land Availability Study 2019

The 2019 JHLAS has been agreed.

The report concludes that CCBC has a land supply of 2.5 years. It replaces the report for the previous base date of 1st April 2018.

Details of the study can be found in the attachment below.

Conwy JHLAS 2019

 

Previous Joint Housing Land Availability Studies

Conwy JHLAS 2018

Conwy JHLAS 2017

Conwy JHLAS 2016

Conwy JHLAS 2015

Conwy JHLAS 2014

Conwy JHLAS 2013

Conwy JHLAS 2012

 

end content